



In construction landscape, project risk isn’t just a concern, it’s the defining factor between successful delivery and costly failure. Commercial developers, industrial facility owners, and institutional buyers face an unprecedented challenge: how to deliver complex projects faster, within budget, and with predictable outcomes in an increasingly volatile market.
The answer lies in a fundamental shift in project delivery methodology that’s transforming the construction industry. Design-build delivery, with its single point of accountability, is projected to account for $2.6 trillion in U.S. construction spending from 2024-2028, representing nearly 50% of all construction projects nationwide according to the Design-Build Institute of America’s 2025 Data Sourcebook.
This isn’t just a trend. It’s a proven methodology delivering 102% faster project completion and 4-6% cost savings compared to traditional delivery methods. For owners navigating multi-market construction challenges across the Southeast, from North Carolina’s booming Research Triangle to Puerto Rico’s pharmaceutical renaissance, understanding how design-build eliminates risk has become mission-critical.
READ ALSO: North Carolina’s $15 Billion Growth Opportunity: Where Technology Meets Construction
Traditional design-bid-build delivery fragments project responsibility across multiple entities: one contract with an architect, another with a general contractor, and countless agreements with subcontractors and consultants. When issues arise and they inevitably do this fragmentation creates a dangerous scenario where no single entity is accountable for the project’s overall success.
Design-build fundamentally restructures this relationship. Under a single contract, one entity assumes complete responsibility for both design and construction. This consolidated approach creates what the construction industry calls “single point of accountability” a concept that’s revolutionizing how complex projects are delivered.
The impact is measurable. Research from Penn State University analyzing hundreds of construction projects found that design-build delivers projects 33% faster and 6% less expensive than design-bid-build, while also reducing change orders by 6%. The U.S. Department of Transportation’s Federal Highway Administration confirmed these findings, documenting a 14% reduction in project duration and 3% reduction in total cost across their design-build portfolio.
Single point of accountability means exactly what it promises: one entity, one contract, one source of responsibility for project outcomes. This eliminates the finger-pointing and blame-shifting that plague traditional delivery methods when schedules slip or budgets expand.
When the design-builder signs a contract, they’re assuming responsibility for meeting agreed-upon schedules, delivering within guaranteed maximum price, achieving specified quality standards, coordinating all design and construction activities, and managing risk proactively rather than reactively. This consolidated accountability creates powerful incentives for the design-builder to optimize every aspect of the project, because they can’t shift blame to another party when challenges emerge.
Budget overruns plague 73% of traditional construction projects, according to Construction Industry Institute research analyzing 351 U.S. building projects. Design-build fundamentally changes this equation through early cost planning and continuous budget integration.
Because construction expertise is embedded in the design process from day one, design-build teams identify cost-saving opportunities before finalizing plans. This approach called “design-to-budget”, ensures that every design decision is evaluated for its cost implications in real-time, not discovered months later during bidding.
Time is money in construction, and nowhere is this more evident than in the 102% faster delivery that design-build provides compared to traditional methods, according to DBIA’s 2025 market analysis.
This acceleration stems from overlapping design and construction phases something impossible in design-bid-build where construction cannot begin until design is 100% complete. In design-build, construction of early work packages can commence while later design work continues, compressing the overall project timeline dramatically.
For pharmaceutical manufacturers racing to bring life-saving therapies to market, or data center operators deploying infrastructure for AI applications, this schedule compression creates immense competitive advantage. Research on pharmaceutical facility construction documented cases where design-build delivered facilities seven times faster at 10% of usual cost compared to traditional approaches.
How many times have you experienced this scenario: the architect blames the contractor, the contractor blames the engineer, the engineer blames unclear design intent, and the project owner is caught in the middle trying to mediate disputes and keep the project moving?
This communication breakdown endemic in fragmented delivery systems, evaporates in design-build. With a single point of contact, decisions happen faster, problems get resolved in real-time, and accountability remains crystal clear. Performance Services helped Wisconsin Heights School District transition from design-bid-build to design-build after years of finger-pointing and surprise change orders. Their design-build project delivered on-time and on-budget with zero change orders, a promise kept through the single point of accountability structure.
The pharmaceutical industry faces unique construction challenges: stringent cGMP compliance requirements, cleanroom validation protocols, FDA regulatory coordination, and intense pressure to accelerate time-to-market for breakthrough therapies.
Design-build has emerged as the preferred delivery method in this sector, with documented cases showing reductions in both project costs and timelines.
The single point of accountability proves especially valuable when coordinating the complex mechanical, electrical, and plumbing systems that pharmaceutical facilities require. When design and construction expertise collaborate from project inception, MEP coordination happens proactively rather than reactively eliminating the conflicts that typically plague pharmaceutical construction.
READ ALSO: Design-Build vs. Traditional Construction: What’s Better for Projects
Data centers and mission-critical infrastructure represent the ultimate test of construction delivery methods. These facilities demand 99.9% uptime meaning even minor construction defects or coordination failures can cause catastrophic operational failures costing millions per hour.
Design-build’s integrated approach excels in this environment. The collaborative team can optimize complex building systems redundant power, precision cooling, advanced security in ways impossible when design and construction operate in silos. As North Carolina attracts major technology infrastructure investments, including significant data center development in the Research Triangle region, design-build delivery has become the dominant methodology for these sophisticated projects.
For commercial developers and industrial facility owners, design-build offers particular advantages in complex, multi-phase projects. The FMI research forecasting design-build growth through 2025 identified manufacturing and industrial facilities among the highest adoption sectors, with design-build spending in manufacturing showing sustained year-over-year growth.
Design-build isn’t optimal for every project, but research has identified clear indicators of when it delivers maximum value:
The U.S. Federal Highway Administration’s comprehensive study of design-build effectiveness concluded that medium to large projects with complexity and size sufficient to enable innovative approaches represent the optimal application of design-build delivery.
Industry forecasts paint a clear picture of design-build’s trajectory. DBIA’s 2025 analysis projects that by 2028, nearly 50% of all U.S. construction spending will be design-build up from approximately 40% in 2020. This represents not just market share growth, but fundamental transformation in how the construction industry delivers projects.
For owners considering design-build for the first time, several factors warrant careful attention:


For owners developing projects across multiple Southeast markets, partnering with a design-builder possessing genuine multi-market experience creates distinct advantages.
This geographic expertise extends beyond regulatory knowledge to practical considerations: regional labor market dynamics, local supplier relationships, climate-appropriate construction methods, and community engagement approaches that respect local context.
In an industry historically characterized by fragmentation, adversarial relationships, and finger-pointing, design-build’s single point of accountability represents a fundamental reimagining of how construction projects can and should be delivered.
The data confirms what forward-thinking owners already know: design-build delivers projects faster, more cost-effectively, and with significantly reduced risk compared to traditional delivery methods.
For commercial developers navigating multi-market opportunities across the Southeast, for pharmaceutical manufacturers racing to bring lifesaving therapies to market, for technology companies deploying mission-critical infrastructure—the question isn’t whether to use design-build delivery. The question is: who will serve as your trusted design-build partner?
CIC Construction Group brings 42 years of design-build excellence across North Carolina, Puerto Rico, and Florida. Our self-performed capabilities in civil, structural and architectural trades, combined with deep expertise in pharmaceutical facilities, data centers, and complex commercial construction, position us to deliver your most challenging projects with the single point of accountability you deserve.
Discover how CIC Construction Group’s design-build approach can accelerate your next project while reducing costs and eliminating risk. Contact our team today for a consultation on your upcoming project.
Contact CIC Construction Group →
Design-build consolidates design and construction under one contract with a single entity responsible for both. This eliminates fragmented responsibility, delivers projects 102% faster, costs 4-6% less, and reduces change orders by 6% according to Design-Build Institute of America and Penn State University research.
Design-build delivers maximum value for commercial developers, industrial facility owners, and institutional buyers with: (1) complex technical projects, (2) accelerated schedule requirements, (3) budget certainty priorities, or (4) medium-to-large projects enabling innovative approaches per Federal Highway Administration studies.
CIC Construction Group delivers 42 years of design-build excellence across North Carolina, Puerto Rico, and Florida, specializing in pharmaceutical facilities, data centers, and complex commercial construction with self-performed in civil, structural, and architectural trades.