

In the fast-evolving world of life sciences, the demand for cutting-edge infrastructure has never been greater. From biotechnology laboratories and pharmaceutical plants to cleanrooms and vivariums, every inch of a life sciences facility must meet rigorous standards. It’s about shaping environments where innovation, research, and healing thrive.
At CIC Construction Group, we understand that these facilities are platforms for breakthroughs. With 42 years of experience, CIC has earned its place as a trusted construction partner in the life sciences sector. We deliver complex facilities that support the future of biotech, pharmaceutical manufacturing, and scientific research.
Since our founding, CIC has delivered mission-critical facilities that meet stringent technical, regulatory, and operational demands. We’ve partnered with global pharmaceutical and biotech leaders, to mention some—Merck, Sartorius, Amgen, Johnson & Johnson, and Terumo—to build specialized spaces where science meets precision.
Our facilities are built in collaboration with architects, engineers, and end users to comply with FDA, cGMP, and ISO standards, support complex workflows, and integrate future-ready technologies.
Also read: Healthcare Construction Excellence: Building the Future of Patient Care
Life sciences spaces demand environments that are both highly functional and human-centric. Our in-house Architectural Interiors Group excels in creating interiors that are clean, compliant, and built to enhance both productivity and comfort.
Whether it’s a BSL-2 lab, GMP production space, or a cleanroom corridor, our capabilities include:
Every element is tailored to support innovation, safety, and precision.
Build Your Construction Career on Innovative, Complex Projects
Today’s life sciences facilities must evolve to support rapidly advancing therapies and technologies. Key industry trends influencing construction include:
Meeting these needs requires more than technical know-how, it demands a partner who understands regulatory complexity, scientific nuance, and future-forward thinking. That’s where CIC delivers.
As the life sciences sector moves into a more complex and accelerated phase of development, CIC is well-positioned to support clients with:
AI is revolutionizing drug discovery, and CIC integrates the necessary infrastructure—data centers, specialized power systems, and temperature control—to support digital research labs.
Life sciences facilities have unique energy demands. CIC implements smart building systems, heat recovery solutions, and renewable energy integrations that support sustainability without sacrificing operational integrity.
Our bicoastal presence in Puerto Rico, North Carolina, and Florida gives clients access to flexible sourcing and logistics strategies, building in redundancy to weather global disruptions.
With design-build capabilities and phased delivery models, we help clients go to market faster—operating in completed facility segments while construction continues on others.
The future of life sciences construction lies in adaptability, integration, and innovation. Emerging trends that CIC is actively planning for include:
With a constant focus on excellence, safety, and innovation, CIC is helping life sciences leaders across Puerto Rico, North Carolina, and Florida stay ahead of the curve.
Whether you’re expanding a biomanufacturing campus, launching a new lab, or modernizing existing infrastructure, CIC Construction Group is your partner for success in life sciences. With deep industry insight, self-performance capabilities, and a legacy of excellence, we’re ready to help you build what’s next.